MG Corporation
international
- MGCI
- About Us
- Industrial Application
- Epoxy Flooring
- PU Flooring
- VINYL Flooring
- Sport Flooring
- U-crete Flooring
- PU Industrial Flooring
- Stamped Texture PU Coating
- Polished Concrete
- Flake Epoxy Flooring
- Metallic Epoxy Flooring
- Floor Hardener
- Protective Coating
- Water Proofing | MG Corporation
- Badminton Polyurethane Flooring
- ESD FLOORING BANGLADESH
- Fire Proof Coatings Bangladesh
- Tennis Polyurethane Flooring
- Building Application
- Admixture
- Spray Polyurethane Foam (SPF)
- Epoxy Anchor Grout
- Food Grade Self Levelling Epoxy Flooring
- MICRO CONCRETE
- MOULD RELEASE AGENT
- Sealant
- Heat Proofing
- STRUCTURE REPAIRS WORK
- Damp Proofing
- Fair Face Bangladesh
- EXTERIOR DESIGN
- Building Fireproof
- Interior Design
- Curing Compound & Mould Release Agent
- Exterior Design
- Road Marking
- Car Parking
- ESD FLOORING BANGLADESH
- Sport Flooring
- Gallery
- Career
- Contact
Heat Proofing
Heat Proofing:MG Corporation: Offer you a water-based, high solids, acrylic latex elastomeric coating reducing the heat loading into a buildings up to 40%. This highly effective radiant barrier, heat reflecting roof coating paint is designed for maximum thermal efficiency, high reflectivity, ultra violet resistance and years of trouble free service. It is most versatile product for concrete roof / terrace applications for effective heat reflection and insulation.
Typical Applications:
Roofs & Terrace
Basements
Asbestos roofs
Aluminum Sheet Roofs
Warehouses
Corrosion Under Insulation (CUI)
Commercial Buildings
Sheds
Mobile Modular Homes
Weather resistant membrane
Wood & concrete
Air-Conditioned Building
Mobile Homes
Fabric embedded membrane
Refrigerated Cold storage Facilities
Surface Preparation :
Brush away loose contamination on the substrate to be coated.
Bio-wash for killing fungus where necessary
Roughen surfaces by wire brush manually.
All surfaces must be clean and free from laitance, dust, dirt, oil and grease.
Please check Moisture level and pHlevel in walls/roof/terrace/ceilings. The moisture levels should be below 12% and pH should be in the range 7-9.
Product Application:The surface should be moist/water wash before application. However avoid puddling/ponding of water.
Apply first coat with brush on the cleaned and washed surface.
Apply second coat after a gap of 1-2 Hours.
After completion of full coating, it should be allowed to cure for 24 hrs. Drying time may vary due to temperature / humidity and surface condition.
Ensure that the coated area does not come in contact with water for at least one hour.
Apply with a quality brush, or roller.
For best results, Apply when surface and ambient temperatures are above 13ยฐC and below 32ยฐC.
After completion of full coating, it should be allowed to cure for 24 hrs. Drying time may vary due to temperature / humidity and surface condition.
Submit Your Query
Get In Touch
- About Us
- Contact Us
- Carrer
- Gallery
- Products
CONTACT US
- House-423, Road-30, Mohakhali, DOHS, Dhaka, Bangladesh.
- +880258052523
- +8801711137359
- mgcirp89@gmail.com
- www.mgci-bd.com
Find us in Facebook
Copyright ยฉ 2023 MG Corporation International